Drilling machine with dawn the hole hammer |
BB drilling machine control |
Micropiling and anchoring drilling machine |
Light pneumatic drilling machine |
Manual leveling jack |
Manual leveling jack extended |
Manual leveling jack kept |
As soon as the drilling point is reached, the four leveling jacks can be installed again through a short maneuver. Then they can be extended as necessary to make possible stable work conditions and the balance of the mast which can be put in vertical position through its hydraulic leveler.
Hydraulic leveling jack extended |
Hydraulic leveling jack kept |
BB drilling machine |
Mast 45º angle |
Gasolin Loncin engine |
BB pneumatic with down the hole hammer |
0 comentarios:
Publicar un comentario